孫晶,孔憲達,山本久志,松井正之,多期間工程の納期制約問題における最適切換方策に関する研究,日本設備管理学会論文誌,Vol. 95, No. 1, pp. 1-6,2014年4月
Xianda Kong, Jing Sun, Hisashi Yamamoto, Masayuki Matsui,A Study on the Target Processing Time of Worker Allocation Optimization Problem in Limited-Cycle Multiple Periods, Information, Vol. 7, No. 6(B), pp. 2619-2634,2014年6月
Peiya Song, Xianda Kong, Hisashi Yamamoto, Jing Sun, Masayuki Matsui, Optimal Worker Assignment in Limited-Cycled Model with Risk among Multiple Periods, Proceedings of 6th Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM2014), pp. 426-433, Sapporo, Japan. 2014年08月23日
Xianda Kong, Hisashi Yamamoto, Peiya Song, Jing Sun, Masayuki Matsui, Optimal Worker Assignment in Limited-Cycled Model Multiple Periods -Considering Continuous Delay as Risk-, Proceedings of 6th Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM2014), pp. 255-262, Sapporo, Japan. 2014年08月23日
Peiya Song, Xianda Kong, Hisashi Yamamoto, Jing Sun, Masayuki Matsui, A Study of Optimal Worker Assignment with Three Rookies under a Limited-Cycle Model with Multiple Periods, Proceedings of the 12th International Conference on Industrial Management (ICIM2014), pp. 161-165, Chengdu, China. 2014年09月03日
Xianda Kong, Hisashi Yamamoto, Peiya Song, Jing Sun, Masayuki Matsui, Paired Property Analysis for Optimal Worker Assignment -Worker Efficiency vs. Task -, Proceedings of 15th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS2014), Ramada Plaza, Jeju Island, Korea, on CD-ROM, 2014年10月13日
Peiya Song, Xianda Kong, Hisashi Yamamoto, Jing Sun, Masayuki Matsui, Numerical Analysis of Three Rookies Assignment Optimization in Limited-Cycled Model with Multiple Periods -the case of Erlang Distribution-, Proceedings of 15th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS2014), Ramada Plaza, Jeju Island, Korea, on CD-ROM, 2014年10月15日
Peiya Song, Hisashi Yamamoto, Xianda Kong, Jing Sun, Masayuki Matsui, A study on rules of three untrained workers' assignment optimization under the limited-cycled model with multiple periods, 1st East Asia Workshop on Industrial Engineering, Higashi Hiroshima Campus of Hiroshima University, Hiroshima, Japan, on USB memory, 2014年11月9日
Xianda Kong, Jianxin Liu, A Basic Study on Limited-Bottom Line Happiness Model with Multiple Periods, Proceedings of the 1st East Asia Workshop on Industrial Engineering, Higashi Hiroshima Campus of Hiroshima University, Hiroshima, Japan, on USB memory, 2014年11月8日
委員等(学会活動)
Conference secretariat of 6th Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM2014), visa application, supporting location Organizing Committee and Program Committee.
海外の他機関との連携による研究活動実績
Xianda Kong, Jianxin Liu, A Basic Study on Limited-Bottom Line Happiness Model with Multiple Periods, Proceedings of the 1st East Asia Workshop on Industrial Engineering, Higashi Hiroshima Campus of Hiroshima University, Hiroshima, Japan, on USB memory, 2014年11月8日(Collaborative research with Professor Jianxin Liu who is the associate dean of Faculty of Humanities and Social Sciences, City University of Macau)